5S Audit Assistant

Convert 5S dimension scores into audit grade, weak-point count, and improvement priority.

All tools free forever

Tip: Score all 5S dimensions first, then prioritize weakest dimensions.

Calculator units
Toggle unit system

Results

14
Total score (/25)
56
Score percentage (%)
2
Weak dimensions (items)
D
Audit grade
Linked Parameter Diagram
fiveSAudit

Input / Output Bars

Inputs

Sort3
Set in order3
Shine3
Standardize2.5

Outputs

Total score14
Score percentage56
Weak dimensions2

Geometry View

Tolerance / Quality Zone

fiveSAudit
Total score
14
Score percentage
56
Weak dimensions
2
Sort
3
Set in order
3
Shine
3
ExportPDF opens the browser print dialog.

Tool role and boundaries

5S Audit Assistant is not a one-shot number widget. It is an engineering baseline tool for real shop-floor decisions. Convert 5S dimension scores into audit grade, weak-point count, and improvement priority. This tool is a general engineering utility intended to reduce lookup and conversion friction in daily programming work.

Treat every output as a first-pass candidate, not an immediate production command: run defaults first, tune one variable at a time, and record machine, tooling, fixture, and material-lot context.

Fast baseline workflow

  1. Run once with defaults to confirm units and expected behavior.
  2. Lock constraints first (dimensions, machine limits, setup boundaries), then tune controls.
  3. Change one key variable per iteration and record why it changed.
  4. Read severity/rule hit first, then execute suggested actions.
  5. Validate first piece with conservative override before moving to target cycle.
  6. Store accepted values with revision tags so shift handoff stays reproducible.

Input strategy

Use a three-layer input model:

  • Constraint layer: dimensions, tolerances, travels, clamping, controller limits.
  • Control layer: speed, feed, engagement, compensation, cycle parameters.
  • Target layer: takt time, cost, scrap risk, tool-change frequency.

A common failure mode is pushing control values before constraints are stable. Lock constraints first, then build a stable operating window with small increments.

Output interpretation

Interpret results in order: primary safety checks first, then stability, then economics.

  1. Safety: no machine, tool, or fixture limit violations.
  2. Stability: load, thermal, and vibration behavior remains controlled.
  3. Economics: cycle and cost align with shift target.

Current focus outputs include Total score, Audit grade, Weak-point count. If numbers conflict with floor behavior, verify units and inputs before changing strategy.

Typical failure modes and fixes

  • Sudden output jump: verify units, decimal precision, and input ordering first.
  • Unexpected trend: inspect workholding, tool condition, and thermal stability before retuning.
  • Big machine-to-machine delta: compare servo behavior, coolant coverage, spindle health, and compensation tables.
  • Shift handoff instability: enforce revision logging for program, tool, and parameter timestamp.

Keep rollback points and use single-variable increments to avoid coupled uncertainty.

FAQ

Can outputs be used directly for production?

Not immediately. Validate first piece, then short-run stability, then release to full production.

Why does floor behavior differ from computed values?

This is expected. Material lot, tool wear, thermal state, and machine dynamics all shift outcomes.

When should I recalculate?

Recalculate whenever tooling, fixturing, material lot, controller parameters, or takt target changes.

Final recommendation

Use 5S Audit Assistant inside a fixed loop: baseline, first-piece validation, single-variable tuning, parameter freeze, and revision tracking. The outcome is not just one result but a repeatable process capability.